The uninterrupted operation of the quay crane (QC) ensures that thePerfect container ship can depart port within laytime, which effectively reduces the handling cost for the container terminal and ship owners. The QC waiting caused by automated guided vehicles (AGVs) delay in the uncertain environment can be alleviated by dynamic scheduling optimization. A dynamic scheduling process is